The Entrenúcleos project, located between Dos Hermanas and Coria del Río (Seville, Andalusia), is expected to begin operations in 2026 and generate more than 435 GWh of renewable energy annually. The plant is designed to meet high sustainability standards and will test, in the construction of the park, structures made of “green steel” - a recycl...